e.) Secure gate plates to gate upright/rail using
" at head screws (Fig. 5).
f.) Set gate on edge and drill two
through the screw holes in the side of the gate
" at head screws per plate
h.) Place the swing arms back into the gate plates
and use included allen wrench to secure the two
set screws that hold the swing arm to the gate
Fig. 5
Fig. 6
Both gate posts must be plumb prior to
a.) Position gate at desired height on post.
Horizontal rails on gate should be even with
horizontal rails on fence (Fig. 7).
b.) Measure space between ground and bottom
of gate and cut two wood spacer blocks to
c.) Rest gate on the spacer blocks and hold it
level/plumb to the gate post.
d.) Swing arm must rest rmly against gate post.
While holding swing arms rmly against post, mark
pilot holes on the post, through the two screw slots
in the front of the swing arms (Fig. 8).
e.) Remove gate and drill
f.) Re-position gate on post and secure hinges with
" pan head screws per hinge.
g.) Open gate and drill three
the three screw slots in the sides of the swing
arms. Holes should be near vertical centers of slots
to allow vertical adjustments of hinges (Fig. 9).
" pan head screws (Fig. 9).
i.) Close gate and check alignment between
horizontal rails on gate and horizontal rails on
fence. If required, loosen hinge screws and move
up or down, as necessary. Re-tighten screws when
3
Fig. 8
Fig. 9
Fig. 7
Comments to this Manuals